playbook
BOQ Audit General Construction
BOQ audited for spec gaps, quantity anomalies, and pricing errors; bids levelled into a Schedule of Values; inspection checklist and escalation clauses ready for use
The bid came in low.
How it runs
- **boq-audit (audit-boq)** → using `--alias {matter-alias}`, parse the contractor BOQ, run the four audit passes (spec-gap, quantity-validation, EO-pricing, cost-completeness), produce markdown audit report + JSON anomaly array with NLM citations on every flag
- **boq-audit (level-bids)** → normalise all contractor bids into a Schedule of Values, flag "too good to be true" rates, buried preliminaries, and missing line items
- **Review audit and SOV findings with owner-rep or QS** — walk through Critical and High flags, agree which to challenge with contractor, agree the lowest responsible bidder advisory
- **Issue findings to contractor** with 7-day response window for itemised re-bid or clarifications
- **boq-audit (inspection-checklist)** → derive a site inspection checklist from the audited BOQ — mock-up requirements, MEP coordination points, hold-points before installation
- **Owner-rep makes award decision** based on audit + SOV + contractor responses + capacity assessment. Award is binding only at this step
What it needs
- Contractor BOQ(s)
- Project context (sector, region, currency, scope summary)
- Drawings (RCP, plans) if available
- Tender deadline and award timeline