Structure Extension of Time claims with FIDIC-compliant notices, delay narratives, evidence marshalling, and Engineer determination templates.

Target Audience: Claims consultants, project directors, quantity surveyors, and contract administrators preparing FIDIC EOT claims in UAE/GCC construction projects.

When to run
"Draft a 28-day notice for a delay caused by late Employer drawings"
Time saved
~3-5 days manual drafting → ~45 min automated
How often
Per delay event · per claim cycle
Compounds
Each claim builds precedent library — rebuttal patterns and evidence templates improve

How it runs

  1. Establish entitlement basis
  2. Check 28-day notice window
  3. Draft notice letter
  4. Review and sign notice
  5. Prepare detailed claim
  6. Anticipate rebuttals
Difficulty
expert
Input
conversation
Output
document
Needs
mcp, api-key
Used by
Operations Manager

What it needs

  • event-description — Description of the delay event and when awareness occurred
  • contract-basis — Relevant sub-clause entitlement basis
  • event-description — Delay event details, dates, and impact
  • schedule-data — Baseline schedule, critical path, and current status
  • existing-notices — Existing notices/claims to audit for compliance

What you get

  • claim-package (markdown)
  • compliance-report (markdown)
  • notice-letter (markdown)
  • {project-folder}/eot_claim_{date}.md
  • {project-folder}/eot_compliance_check.md
  • {project-folder}/eot_notice_{date}.md

Ask it like this

  • Draft a 28-day notice for a delay caused by late Employer drawings
  • Prepare a detailed EOT claim for the site access delay on Project X
  • Check if our existing notices comply with FIDIC 2017 requirements
  • How many days can we claim for the variation-related delay?